Nearly forgot, The drainage and ventilation for the space around the sealed units. This goes on the TS Meeting rail and BS Bottom rail.
First drill the holes, a little difficult on the BS Bottom rail as the stroke on my drill press isn't long enough. So I did it in two stages and added a packer for the second stage. Then router the groove in, this should allow any water that gets past the seals to find the hole and drain away.
Credit Dave - clamp a same height as the top of the rebate, use a low fence (to avoid the clamps )on the router table - easy, cheers Dave.
Re-assembled result
No comments:
Post a Comment